PROJECT PUNCHLISTS
- Kristian Berryhill
- Oct 26, 2023
- 1 min read
Updated: Nov 3, 2023
Who else puts off doing that last 10% of a project?
I despise it, BUT I am determined to get into project mode and knock out the last bit left of the Primary Bedroom and Q’s Bedroom before the end of the year, ideally before the holidays. I would really love to repaint the Living Room before Christmas too since I finally feel settled on the color!
A “punchlist” of what is left of the bedroom projects and pre-reveal sneak peeks:
Q BEDROOM
Artwork
Chain + Hooks
Pick art for frames
Paint touch ups
Window Hardware
Window Treatments
(1) to hang
Add shades/sheers to block more light
Kichler Ceiling Fan switch
Closet dresser
Order Ikea
Paint (repaint shelf to match)

PRIMARY BEDROOM
Artwork
Chain + Hooks
Install Picture Rail
Caulk
Hang Closet Door
Hardware (finish removing paint, install)
Vintage Ceiling Fan
Paint touch ups
Rug
Curtains
Custom Bolster pillow (Italian Damask)
AFTER HOLIDAYS
Exterior Door
New hardware to match original
Replace metal storm door with wood screen door + paint
Frame TV over fireplace mantle (req. electrical work)
Ceiling
Remove existing tiles
New Sheetrock
Paint (paint wall above picture rail also)
Small Closet (Tea/Coffee Bar)
Paint
Add drawers + paint
Add Counter
Add Shelves + paint
Electrical for small appliances
Stock!

Comments